Archive > Construction Projects > J D'Amico Inc., Section 28 Suction to Brattle Court Pump Station

Section 28 Suction to Brattle Court Pump Station: MWRA Contract # 6546

54" Flanged Butterfly Valve 54" Flanged Steel Pipe

D'Amico Installing 54" Flanged Butterfly Valve

D'Amico Crew... Part of Section 28 Suction to Brattle Court Pump Station    
D'Amico - MWRA Contract #6546 D'Amico Excavator Moving 54" Butterfly Valve    
Water Works Supply Corp. Supplied the 54" Flanged Butterfly Valve D'Amico Crew Checking the Valve    
Placing the 54" Flanged Butterfly Valve In Line With the Flanged Pipe MWRA Contract #6546 - Fall 2010    
Final Placement by D'Amico of the 54" Valve      
Phase 3 included the installation of a new 54" butterfly valve on MWRA's WASM 3 line
Contractor:
J D'Amico Inc
., of Randolph, MA
Project:
Section 28 Suction to Brattle Court Pump Station: MWRA Contract # 6546 awarded at a cost of $1.9M
Date:
September 2010
Location:
Arlington, MA
Authorizing Authority:
Massachusetts Water Resources Authority
Project Manager: Mike Lenihan
Project Supervisor:
Frank
Engineer:
Green International Affiliates of Westford, MA

Materials Included: 54" Flanged Butterfly Valves and 20" Gate Valves With Blow-Offs
Summary:
The Section 28 Project to rehabilitate the Section 28 pipeline in Arlington was awarded to J D'Amico by MWRA. Section 28, constructed in 1899, is the oldest of the suction mains serving The Brattle Court Pump Station. The photos above are from Phase 3 which included the installation of a new 54" valve on WASM 3 line and new interconnections with Section 28.
For more info contact Richie Ross, WWSC Outside Sales, Malden, MA at 781.844.4216